MaxiPrinter
ON SITEFolding arm on wheels, 7 m reach, 150 m², 250 mm/s, electric or diesel.
Models in our catalogue
Updated
MANUFACTURER
Robots in catalogue 3
Constructions-3D, a French manufacturer based in northern France, has designed machines that print concrete structures since 2017. Its MaxiPrinter, a folding robotic arm on wheels, printed La Tour, a 14 m building that set a height record in 2024, and a Guinness-record villa in Dubai. The company also develops its own slicer and a low-carbon micro-concrete. Robot Distribution presents these printers and can relay a project to the manufacturer.
Robot Distribution supplies 3 robots from Constructions-3D in Europe, to buy, rent or take as RaaS, with the EU declaration of conformity, spare parts and after-sales service from Europe. Price on a written quote, sent within 2 working days.
KEY FIGURES
Sources: Constructions-3D site (constructions-3d.com), product pages, FAQ and About page, checked on 11 November 2026, and regional press. Figures as published.
HISTORY
Constructions-3D is founded and starts by developing its printers with the mortars on the market.
First 3D-printed building in France, at the Citadelle des Savoir-Faire.
400 m² villa printed by 3DXB for Dubai Municipality, a Guinness world record.
La Tour, 14 m high and 500 m², a height record printed in 150 hours.
THE SERIES
Folding arm on wheels, 7 m reach, 150 m², 250 mm/s, electric or diesel.
Models in our catalogue
2.5 × 1.2 × 1.2 m gantry, 400 mm/s, several parts per bed.
Models in our catalogue
1.2 m cube gantry, 400 mm/s, open to all mortars.
Models in our catalogue
TECHNOLOGY
Reads STL and DXF files from AutoCAD, Revit or SketchUp, logs the site data, no subscription.
Low-carbon printable micro-concrete, made in the company's plant in France and delivered in one-tonne big bags.
The MaxiPrinter aligns its print area with the drawing using a built-in laser.
APPLICATIONS

Constructions-3D printers also produce poles, urban furniture, bridge elements, artificial reefs and textured precast parts.
QUALITY AND PRODUCTION
Constructions-3D publishes its prices in dollars: MaxiPrinter from USD 519,000 excl. tax, MiniPrinter XL USD 124,900, MiniPrinter EDU USD 79,900. Each MaxiPrinter ships in a container with one week of training in France; technical support answers 7 days a week and parts are stocked worldwide. Robot Distribution shows these prices converted into euros and can relay a project to the manufacturer.
WHY WE DISTRIBUTE CONSTRUCTIONS-3D
We list 3 robots from Constructions-3D, chosen for jobs our customers ask for by name: construction robots. Each model shows the specifications its manufacturer publishes.
Every Constructions-3D robot we supply comes with its EU declaration of conformity. We are reviewing the range model by model against Machinery Regulation (EU) 2023/1230, which applies from 20 January 2027.
Parts, repairs and operator training are handled by Robot Distribution in Europe. Robots can also be rented or taken on a RaaS contract, so a trial does not need a purchase.
THE RANGE

Construction robots

Construction robots

Construction robots
Figures from the manufacturer's published specifications. Availability is shown per robot.
WHAT ROBOT DISTRIBUTION ADDS
Five things come with every Constructions-3D robot we supply, whether you buy it, rent it or take it as a service.
See all servicesEuropean stock. Robots, batteries and common spare parts are held in Europe and dispatched from there.
EU declaration of conformity. Supplied with every robot, with the technical file available to resellers on request.
After-sales and parts. One point of contact for diagnosis, repair and replacement parts, under warranty and after it.
Training. On-site or remote sessions for operators and for the reseller's own technicians.
Rental and RaaS. Short rental, medium rental, or one monthly fee covering robot, maintenance, software and replacement.
The vertical walls, as well as poles, columns and urban furniture; floors and roof remain conventional.
15 to 30 minutes according to the manufacturer, against up to a week for a gantry printer.
Most pumpable printable mortars, including Sikacrete-733, or the manufacturer's Albert micro-concrete.
Yes. Every Constructions-3D robot Robot Distribution supplies is delivered with its EU declaration of conformity, and the technical file is available to resellers on request.
Robot Distribution offers short rental (1 to 30 days), medium rental (1 to 12 months) and Robotics-as-a-Service contracts (24 to 60 months). The written quote states which acquisition modes apply to each Constructions-3D robot.
Robot Distribution is the single point of contact for diagnosis, repairs and replacement parts of the Constructions-3D robots it supplies, under warranty and after it.
The specifications come from the official pages of Constructions-3D, checked on 15 Nov 2026. A value the manufacturer does not publish is left out rather than estimated.
A written proposal in 2 working days: robots, acquisition mode, delivery time.